Aviva Studios (Factory International)
Special feature
BEMO supplied a complete design package for The Factory in Manchester, which included the provision of standing seam cladding (N65/400), substructure, gutters and cappings. Installation was carried out using GRP halters and a bespoke adjustable substructure. The roof was produced directly on-site. Thanks to Lindner Prater Ltd for the successful collaboration!